A. HOUSING - High temperature painted 22 gauge cold rolled steel construction for maximum heat dissipation and rust protection. Adjusts vertically in plaster frame to accommodate 1/2” to 1-3/8” ceiling.
B. SOCKET - One vertically mounted plug-in socket. Unitized optics guarantees proper trim to housing installation. Tool-less installation adjusts from inside the housing.
C. BALLAST - Thermally protected, current controlled ballast, will produce full light output, increase lamp life with no noise and flicker. Ballast supplied is manufactured by Advance.
D. BAR HANGERS - Preinstalled bar hangers allow housing to be positioned and locked at any point within a 24” joist span. They can be positioned on either the long or short axis of the housing and can be shortened for 12” joists. They contain a double-headed real nail for secure attachment into the joist. Bar hanger nails are installed on a 20º downward angle for better contact, and the 90º pivoting mounting plate makes installation fast and accurate. Bar hangers can fit onto T-Bar spline with additional slots and holes for special mounting methods if necessary.
E. JUNCTION BOX - Listed for through-branch circuit wiring and has four 1/2” KOs, one 3/4” KO and four Romex knockouts with true pry-out slots and strain clamps.